discharge capacity

基本解释泄水能力

网络释义

1)discharge capacity,泄水能力2)discharge capacity,泄流能力3)flood discharge capacity,泄洪能力4)discharge capacity,泄洪能力5)pre-discharge capacity,预泄能力6)discharge capacity,排泄能力

用法和例句

Some discussion on discharge capacity of discharge structure;

浅析泄水建筑物的泄流能力

Flood and discharge capacity recheck for Laxiu reservoir;

拉秀水库洪水及泄流能力复核分析

Discussion on discharge capacity formulas for weir sluice and tunnel;

堰闸隧洞的泄流能力计算公式商榷

In this paper variation in flood discharge capacity of the Yangtze River ChenglingjiLuoshan reach after completion of Three Gorges Project and flood control situation the reach will be faced with after operation of Three Gorges Reservoir are analyzed.

分析了长江城陵矶~螺山河段行洪能力的变化和三峡水库运行后该河段面临的防洪形势,指出降低城陵矶河段水位的有效措施之一是恢复河道原有的泄洪能力,实施牌洲裁弯、清淤疏浚和削矶扩卡等为主的工程措施。

Based on the floodway model test of Hechuan diversion works,this paper analyzes the flood discharge capacity of its floodway,and presents a scientific and reasonable project proposal for the analogous of water conservancy project.

泄洪洞的泄洪能力直接影响水库的行洪安全。

Influence of discharge width ratio of two branches of a low water head project at branching channel on flood discharge capacity;

分汊河段低水头枢纽两汊泄流宽度对泄洪能力的影响

The text adopts traditional hydraulics method to calculate the flood discharge capacity of certain tailing pond drainage system, fix on the relationship curve between the water level of the tailing pond and the discharge, then process reservoir flood routing according to the water-balance equation, at last choose the ap.

本文采用传统的水力学方法对某工程尾矿库的排洪系统的泄洪能力进行计算,确定尾矿库的水位与下泄流量关系曲线,然后根据水量平衡方程进行调洪演算,确定排洪系统所需的调洪库容和调洪水位,从而为尾矿排洪系统设计提供可靠的依据。

Study of General Layout of Linghuaigang Complex and Discharging Capability;

临淮岗枢纽总体布置及泄流能力研究

Study on Discharge Capacity of Water Gate in Tidal Plain Water Network Area

平原感潮河网地区水闸泄流能力探讨

Evaluation of Numerical Simulation on Discharge Capacity and The Way Used to Track Free-Surface-Taking The Rectangle Sharp-Crested Weir as An Instance

数值模型计算泄流能力和模拟自由水面的评价—以薄壁堰流为例

Study on Discharge Capacity and Energy Dissipation Measures of Mid-low Head Sluice-dam Project;

中低水头闸坝枢纽泄流能力及综合消能措施研究

The labyrinth weir has the advantage of discharge capacity relative to that of the straight weir.

迷宫堰相较于直线堰,最大的优越性体现在它的泄流能力上。

Effect to Risk Rate of Dam′s Flood Carrying Capacity Under Dynamic Controlling the Normal Water Level in Flood Season

动态控制汛限水位对大坝泄流能力风险率的影响

Study for High-head, Long Pressure Pipeline Safety Discharge Energy Dissipation;

高水头、长压力管道安全泄流消能研究

Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel;

水平旋流内消能泄洪洞水力特性的数值模拟

On River Bed Scour Resistance Downstream of High Spillway Dam in Canyon Region with Big Flood Discharge

试论峡谷区大泄量高溢流坝下游河床的抗冲能力

The trajectory bucket is improved and optimized for suitable trajectory distance and small scouring.

泄洪洞挑流坎挑流消能时,当泄流量较小时,挑距较短。

Piping systems shall be designed and supported so that they can withstand recreation forces due to discharge of fluids.

管道系统应该这样来设计和被支撑,即,使它们能够经受得住由于流体的放泄所产生的反作用力。

Theoretical expression ot the wall shearing stress has been deduced for the level rotary flow in an internal energy dissipation tunnel.

本文推导了水平旋转内消能泄洪洞空腔环流壁面切应力的理论分析表达式。

Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;

低水头大流量厂坝联合泄洪消能流场的研究

Discussion on discharge capacity calculations of drainage system of tailing ponds

某尾矿库排洪系统泄洪能力计算探讨

Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel;

导流洞改建泄洪洞衔接段水力特性研究

The Study on the Influences of the Bucket Lips Selection to the Nappes and the Pressure on the Slabs;

坎型选择对泄流水舌及底板压力的影响研究

Research on Inverse Problems of Hydraulic Structure in Dynamics Based on Flow Discharge Excitation

基于泄流激励的水工结构动力学反问题研究

Progress of research on backward problems of hydraulic structure dynamics induced by flow excitation

水工结构泄流激励动力学反问题研究进展

最新行业英语

行业英语