prestressed-concrete vessel top slab

基本解释预应力混凝土[压力]容器顶板

网络释义

1)prestressed-concrete vessel top slab,预应力混凝土[压力]容器顶板2)pre-stressed concrete pressure vessel,预应力混凝土压力容器3)shear cleat,(预应力混凝土压力容器)剪力固着楔4)prestressed concrete reactor pressure vessel,预应力混凝土反应堆[压力]容器5)prestressed concrete pressure vessel (PCPV),预应力混凝土压力(壳)容器6)prestressed-concrete pressure vessel liner tube,预应力混凝土压力容器衬管

用法和例句

With application of pre-stressed concrete pressure vessels(PCPV) instead of steel pressure vessels as the primary circuit pressure boundary of MHTR,the residual heat removal system must be designed specially.

采用预应力混凝土压力容器(PCPV)代替钢制压力容器作为MHTR的一回路压力边界,对余热排出系统设计提出了特殊要求。

最新行业英语

行业英语