Optimized analysis on canceling arrangement of tailwater surge tank for diversion-type hydropower station;
长引水式水电站取消尾水调压室的优化分析
Analysis on operation safety and stability for diversion-type hydropower station after extension;
扩建增容引水式水电站运行的安全稳定性分析
Optimized Design of Diversion of Water to Control Sediment of Yao River Dam Diversion Type Power Station on Nanya River;
南桠河姚河坝引水式水电站引水防沙优化设计
Research of Interfere between Turbines in a Hydroelectric Power Station with High Head and Long Head Race Tunnel;
高水头引水式水电站机组之间干扰问题研究
dam - diversion type hydroelectric power station
坝-引水混合式水电站
This is a diversion power station of high flood peak.
该工程为高水头迳流引水式电站。
Study of Sediment Accumulation and Diversion of Water to Control Sediment in Hydropower Stations in Mountain River
山区河流引水式电站水库泥沙淤积及电站引水防沙问题研究
Research on Gate Auto-monitor System of the Divertion Type Small Hydropower Station;
引水式小型水电站闸门自动监控系统的研究
Numerical Simulation and Optimization of Bend-Type Ice Removal in the Diversion Water Channel of Powerhouse
水电站引水渠道弯道式排冰数值模拟与优化
dam-type power station
堰堤式发电站,蓄水式水电站
Study on Improving Control System for Units in the Cascade Diversion Power Station;
梯级引水式电站机组控制系统优化研究
Construction ventilation for power tunnel system of Nozhadu Hydropower Station
糯扎渡水电站引水发电系统施工通风
Application of portal lining jumbo in construction of bottom arch of diversion tunnel of Liuping Hydropower Station
自行式底拱衬砌台车在柳坪水电站引水隧洞施工中的应用
Code for design of hydropower headrace and forebay
水电站引水渠道及前池设计规范
Experimental Investigation of the Cooling Performance of Tailrace Tunnel Ventilation in Hydropower Stations;
水电站无压尾水洞引风换热试验研究
Hydraulic Transients Research of Diversion System in Cascade Hydropower Stations Connected by Open Channel;
梯级电站引水系统水力过渡过程研究
Effective Ventilating Length of Tailrace Tunnel in Hydropower Stations
水电站无压尾水洞引风有效作用长度
Summary on the Excavation of Tailrace Surge Chamber in Generating System of Xiaowan Hydropower Station
小湾水电站引水发电系统尾水调压室开挖综述
Hydraulic Transients Research on Diversion and Power System of Transbasin Diversion Power Station;
跨流域引水水电站引水发电系统水力过渡过程计算研究
An attempt to use 35kV box-type transformer substation for construction power supply of Tao River Water Diversion/Transfer Project Ⅰ
引洮供水一期工程施工供电采用35kV箱式变电站的尝试