Application of cross-mound Longmen support in pile equipment and construction;
跨墩龙门架在箱梁安装施工中的应用
This paper briefly introduces the technical process of the erection of main beam joints and main beam of 5t double-beam gallows crab bucket by usi ng 500×500 portal frame, sleepers and 50 t and 30 t autocranes, and expounds em phatically the overall design of the schemes, the selection of bearing platform s steel columns, the verification of the strength, and the erection of the platf orm, etc.
主要介绍了利用500×500龙门架,道木及50t、30t汽车吊进行5t双梁龙门抓斗主梁接头、主梁安装的工艺过程,并对其方案总体设计情况、支撑平台钢柱的选择、强度校验及平台搭设等环节进行了重点阐述。
Each succeeding fabricated box is erected on trolleys.
每段预拼的箱梁安装在小平车上。
Some suggestions of cantilever installation of steel box shaped girder are given.
对悬拼法钢箱梁安装提出了一些有益的建议。
STEEL BOX BEAM INTEGRAL ERECTION MAKE USE OF TRANSFORMING SUSPEND-BASKET FORMING BOMMS
利用挂篮改制成的吊梁实现钢箱梁整体安装
The adjusting technology of long span prefabricated box beam over small radius curved bridge
小半径曲线桥梁上大跨径预制箱梁的安装技术
Research on Stiffening Girders Erection and Temporary Connection of Suspension Bridge;
悬索桥钢箱加劲梁安装过程及临时连接的研究
Precasting and Installation of the Double-Track Simply Supported Monolithic Box Beams of High-Speed Railroad;
高速铁路双线整孔简支箱梁的预制和安装
Analysis of Spatial State for Temporary False Work of Steel Box Girder During Large Segmental Installation
钢箱梁大节段安装临时支架空间状态分析
Technical Plan for the Setting-up of 30 m Box Girder Using Bailey Truss
使用贝雷桁架进行30m箱梁架设安装技术方案
Installation and inspection of concrete simply supported girder with post-tensioned prestressing
后张法预应力混凝土简支箱梁模板安装与检查
Installation and System Conversion of 60 m Precast Box Girder of Jintang Bridge
金塘大桥60m预制箱梁的安装与体系转换
During fabrication slots for the stringers flanges were flame cut into box girders.
制造时,为安装纵梁翼缘,在箱型梁中用焰割法开槽口。
The Installation of 730KN Steel Supports and Construction Design of Unloading for An Nin River Bridge Main Bore Box Beam;
安宁河大桥主孔箱梁730KN钢支架安装与卸架施工设计
Container Safe Convention
《集装箱安全公约》
Install transmission and Transfer Case.
安装变速箱和传动箱
formwork structure and installation technology of 60m precast box girder of Qingdao Gulf Bridge
青岛海湾大桥60m预制箱梁模板结构及安装施工技术
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
Install the rear transmission mount.
安装后部变速箱装置。