pile group

基本解释桩,桩组

网络释义

1)pile group,桩;桩组2)cluster of piles,桩群,桩组3)piles,桩4)pile foundation,桩5)Post,桩6)stub,桩

用法和例句

3D finite element analysis of parallel seismic tests for integrity of piles of existing structures;

旁孔透射波法检测既有建筑物桩基的三维有限元分析

Analyzing the function of piles in composite foundations;

复合地基中桩体的作用机理探讨

Study of the method for the determination of load bearing capacity of piles;

桩承载力确定方法的探讨

Fuzzy stochastic reliability analysis of pile foundation;

桩的模糊随机可靠性分析

Numerical Analysis on the Effect of Creep and Discrepant Settlement on the Pile Foundation;

蠕变和差异沉降对桩基影响的数值分析

With the development of offshore engineering, pile foundation had been widely used in the offshore platform, port pier, etc.

随着近海工程的发展,桩基被广泛地应用于近海平台、港口码头等工程中。

Microleakage of Metal Post Cemented with Three Luting Cement;

三种粘结材料粘结金属桩钉的微渗漏研究

Disputes of post-core-crown restoration;

有关桩核冠修复的几点争议

The Effect of Different Fabricating Methods and Luting Cements on Retention of Posts;

不同制作方法及不同粘接材料对桩固位力影响的实验研究

<Abstracts>An approach adopting the technology of inserting stub to implement embedded remote debugging is addressed in this paper.

为解决嵌入式系统不支持本地调试,且开发周期较长的问题,提出了一种采用软件插桩技术针对嵌入式系统的远程调试方案;对嵌入式系统远程调试所采用的关键技术及其工作原理作了详细说明,介绍了调试器基本功能的实现过程、交叉调试所用到的远程通信协议,最后重点剖析了调试器的设计与实现要点;实践证明该设计方案较好地解决了嵌入式系统调试过程中受限于系统自身资源与空间的问题,缩短了系统开发周期,达到设计要求。

driver-extractor vibratory hammer

两用震动锤

To enclose, secure, tether, mark out, or fortify with pickets.

用尖围住用木

A structure composed of piles.

结构由组成的结构

Piles considered as a group.

丛被认为是一组的

Application of the ram-compaction pile with PHC pre-stressed tube as body

PHC管身的复合载体的应用

Study on Pile-Soil s Stress-Stain of Tubular Piles before and Back Grouting;

底注浆前后土应力应变特性研究

Study on the Effect of Integrity of Bored Pile on Bearing Capacity of Pile Foundation;

钻孔灌注基完整性对承载力的影响研究

Research on Construction Technique and Working Mechanism of Bored Pile by Base Post-Grouting;

钻孔灌注端后压浆工艺与机理研究

Analysis on Bearing Capacity of Prestressed Concrete Pipe Pile, Pipe-drived Pile, Bored Pile;

软土中管、沉管、钻孔承载力的分析

Study on Mechanism and Resistance in the Process of Driving Pretest Piles;

预压托换的压机理与压阻力研究

Study of Sinking-resistance and Compaction Effect of Static-press Pile;

静压施工沉阻力及沉挤土效应研究

The Dynamical Examination and Judgement of Perfusion Stake Base with Jamming Slurry on Stake End;

端后压浆灌注基动力的检测与评定

Study on the buildingpiles instead of piles testing in mul-piles cap of factory building

承台厂房将工程作为试的研究

Study on Pile Diameter and Pile Spacing of Cement-soil Piles Composite Foundation

径和距对搅拌复合地基影响的研究(英文)

Application of lime-soil compaction pile and CFG pile double composite foundation handling

灰土挤密与CFG复合地基处理应用

Talking about Pile Driving Effects into Account,Calculation of Design of Interval Between Piles for Reinforcement of Weak Foundation

考虑打效应CFG加固软基间距设计计算

INFLUENCE OF PILE BOTTOM SLIME ON SKIN FRICTION AND BEARING CAPACITY ESTIMATION TO PILE

底沉渣对侧摩阻力影响及承载力的估算

On the experimental research on the bearing capacity of the super-long pile's grouting technique of pile side and bottom

底注浆超长承载性能实验研究

最新行业英语

行业英语