measured drawing

基本解释实测图

网络释义

1)measured drawing,实测图2)work as executed drawing,实测图3)surveyed map,实测图4)survey,实测5)measurement,实测6)measure,实测7)Field Measurement,实测8)test,实测9)actual measurement,实测10)site measurement,现场实测

用法和例句

Analysis to contrasting with the calculated result and surveying data of controlling concrete crack;

混凝土裂缝控制计算结果与实测值的对比分析

Adopting survey technology of double-head water-stopped machine flowing high of upward-inclined drillhole rock destruction rules were surveyed,development height of water conducted zone was gained.

采用井下仰斜钻孔双端堵水器导高观测技术对白庄煤矿综放开采条件下,覆岩破坏规律进行了实测,得出了导水断裂带的发育高度。

Course and method of surveying specific property of rolling mill's frame's behavior with CRAS are introduced in this paper.

介绍了利用CRAS系统对轧机机架动态特性进行实测的过程、方法,并给出实测结果及分析。

The comparison of the results of FEA and stress measurement for 1500 dryer verifies the mold.

通过 15 0 0烘缸有限元计算结果与应力实测的比较 ,验证了模型的正确

Then the measurement and the analysis process of the data are presented.

为此 ,详细介绍了黑龙江 336m高钢结构电视塔实测试验所用的仪器设备、人工激振方法、信号采集及结构模态分析等方法 ,为结构分析提供了较好的试验依

The results indicate that this vibration control method is economical and effective, the analysis method of measurement on site is feasible.

在 336m高黑龙江广播电视塔悬挂水箱减振器振动控制研究的基础上,对其进行了实测和分析。

A measured study of post-tensioning bonded prestressed concrete continuous beam;

后张有粘结预应力混凝土连续梁张拉控制参数实测研究

In this paper,three tall buildings structures in Lanzhou are studied as examples far presenting the measured results of the resilience and the reaction distribution ofthe pebble subgrade.

本文以兰州市三座高层建筑为例,主要介绍卵石地基回弹、反力分布、箱形基础沉降观测、上部结构自振特性等问题的实测结果。

Analysis of field measurement data on responses of metro tunnel due to substructure construction;

地下工程施工影响地铁隧道的实测分析

Analyses the ventilation effect in the double-skin facade of a refurbished building in summer and winter through the field measurement data including air temperature and velocity in the passage and temperature of inside surface of the wall.

对某改造建筑的双层皮外围护结构间层通道内的冬、夏季空气温度和速度及内侧墙体壁面温度进行了实测,分析了该双层皮外围护结构在冬、夏季的通风效果,结合室内工作者在外围护结构改造前后对室内空气环境的舒适性感受,分析了该双层皮外围护结构设计上的一些问题,指出了该结构体系设计中的注意事项。

The purpose of this study is to identify the ventilation effectiveness of a displacement ventialtion system in a concert hall with 500 seats by full - scale field measurement.

本研究针对剧场建筑空间的置换空调方式中两类典型的送风系统(侧送风和座椅送风),以实际工程项目为例,应用实测,实验室实验,CFD等手段进行了考证研究。

With an unconditioned residential unit in Beijing as the test object,simulates the indoor temperature,and compares the simulated and measured temperatures.

北京市未安装空调的某户住宅为研究对象,模拟计算了测试房间的室温,并将模拟结果与实测数据进行了比较。

The paper has a study on properties of pile raft foundation for high buildings based on test.

基于作者所能搜集到的有关桩筏基础实测和试验资料 ,对桩筏基础的一些工作性状进行了分析和讨论。

In order to reduce the voltage a test is carried out on the contact wire of the third railway line(called the third line for short)in Guang Zhou_ShenZhen line.

为了找到限制复线接触网感应电压的措施 ,对广州深圳电气化铁道第三接触线 (以下简称第三线 )上的感应电压进行了实测 ,发现第三线悬浮状态时的感应电压可达 3 0 0 0V以上 ;第三线测试区段的一端或两端接地且相邻高速接触线 (以下简称高速线 )上无电力机车时第三线的感应电压基本可以忽略 ,当高速线上有电力机车时第三线感应电压瞬时超过数百伏。

This paper introduces the characteristics and site measurement results of this transfer structure,and would be a reference for the d.

山东省世界贸易中心二期工程成功采用了一种大跨度叠层空腹桁架整体转换结构体系 ,该体系利用双向正交共五榀叠层空腹桁架的整体共同工作 ,既实现了 3 1m× 2 7 3m的大空间结构转换 ,又保证了两层转换结构的建筑使用空间与功能 ,是一种结构新体系的成功探索与实践 ,本文介绍了该转换结构体系的特点和建造过程中现场实测的方案与结果 ,从而为相关工程技术人员提供参

最新行业英语

行业英语