construction schedule

基本解释施工进度计划

网络释义

1)construction schedule,施工进度计划2)Construction schedule plan,施工进度计划3)overall construction schedule,施工总进度计划4)schedule of construction,计划施工进度5)single project construction schedule,单位工程施工进度计划6)construction schedule,工地计划,施工进度

用法和例句

Comparing with the traditional theory, this paper bears two new frames of reference in planning the construction schedule.

与传统理论相比,本文在编制施工进度计划时有两个方面的突破:一是通过施工项目的工艺流程分析,来确定施工项目在线路的持续时间;二是通过施工预算来确定工程总用工。

This paper expounds the common forms and procedures of the construction schedule, and introduces the compilingprocedures and methods for the programme ofpreparatoryworks and the resources requirement plan.

阐述了施工进度计划的常用形式、步骤,介绍了施工准备工作计划以及资源需要量计划的编制过程和方法。

From the point of view of supervion,this paper anticipates the rationalization and stabilization of construction schedule provided by contractor in construction preparatory stage, and the consequences caused by an accident, then gives some advises to solve.

围绕这一问题 ,从监理单位的角度对施工准备期承包商提交的施工进度计划的合理性、预测施工进度计划的稳定性 ,以及意外事件发生的可能后果进行探讨 ,并提出相应的处理措

In order to prepare and optimize construction schedule plan,the calculation of earliest start time,latest start time,earliest finish time,latest finish time,total float and free float of the project′s works is very important.

为了编制和优化施工进度计划,计算构成施工项目的各项工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差和自由时差等时间参数十分重要。

Construction schedule plan management refers to the establishment,the implementation and the supervision of construction schedule plan.

施工进度计划是施工单位进行生产的重要依据,也是采购材料和用工计划等经济活动的参考依据,它从施工单位取得建设单位提供的设计图纸进行施工准备开始,直到工程竣工投产交付使用为止。

This paper discusses the optimum method of overall construction schedule in the view of systematization and analyszes the factors concerned with overall schedule.

本文从系统观点出发,首先对影响施工总进度计划的有关因素进行了分析,建立了以系统总体经济效益最好(即施工总费用最少)为目标的施工总进度计划优化数学模型,并提出了解此模型的计算机方法,通过算例求解介绍了使用该程序的具体步骤。

The paper points out the two forms of single project construction schedule and the different result in using through living examples, and analyzes the reasons.

通过实例指出单位工程施工进度计划的两种表示形式在应用中出现的不同结果,并分析了其中的原因。

New Consideration on Designing Unit Construction Schedule;

编制单位工程施工进度计划的新思路

Construction Schedule Control Technology under Multi-restrict Events;

多约束事件下施工进度计划控制技术

RISK ANALYSIS OF CONSTRUCTION SCHEDULE WITH OPTIMUM CASH FLOW;

最优资金流施工进度计划的风险分析

Study on Project Scheduling and Resource Optimization in Highway Construction Based on Petri Nets;

基于Petri网的公路施工进度计划及资源优化研究

Methods of Arhythmic Pipelining Building Schedule Cartography;

非节奏流水施工进度计划的直接绘图法

The Installation Schedule and Optimization Method for Mechanical and Electrical Equipment of Hydro Power Station

水电站机电设备安装施工进度计划及优化方法

Direct rendering method of different beat flow construction procedures planning

异节拍流水施工进度计划的直接绘制法

Primary Research on the Application of the Ideas of Critical Chain and Rolling Planning in Construction Schedule Planning of China's High-speed Railway

关键链和滚动计划思想在高铁施工进度计划中的应用初探

Target Monitoring-Forecast and Control-Harmonization Rules on Buliding Progess Planning of Construction Engineering;

工程建设施工进度计划目标监测预警及其调控规则

Optimization of Water Engineer Construction Programmer Based on Multi-objective Genetic Algorithm

基于多目标遗传算法的水利工程施工进度计划优化

The Preliminary Research in CAD System of the Integration of the Construction Layout and the Operation Schedule;

集成化的施工进度计划和施工平面布置的计算机辅助设计系统的初步研究

Study on Network Planning Standardization Oriented to Construction Organization Design

面向施工组织设计的网络进度计划标准化研究

Differences between schedule progress and actual progress in construction of railway projects;

谈铁路工程的设计计划进度与实际施工进度的差异

Application of Dual Code Number Schedule Plan in Management of Construction Project

双代号进度计划在施工项目管理中的应用

159 our major planning items contain estimating of cost and construction schedule.

我们主要的计划工作项目包括费用预算和施工进度。

(13) the progress plan for the construction of the project; and

(十三)项目实施的进度计划;

Plan and Control of Schedule in Telecommunication Design Project

通信工程设计项目的进度计划与控制

development programme

发展进度表;发展进度计划;发展计划;建筑工程时间表

最新行业英语

行业英语