climbing shuttering

基本解释爬升模板

网络释义

1)climbing shuttering,爬升模板2)hydraulic up-climbing shuttering,液压爬升模板3)Climbing formwork 150F,150F爬升模板体系4)caterpillar track climbing formwork,导轨式爬升模板5)creeping formwork pouring method,爬升模板浇注法6)climb,爬升

用法和例句

Design & application of non-preburied & connected spiral climbing shuttering;

无预埋联接螺栓爬升模板的设计与应用

The construction technology of hydraulic up-climbing shuttering is developed by our country,and the construction technique of it is after up-climbing one floor walls and columns,pouring one floor slab.

我国自行研发的可升降液压爬升模板施工技术,采取爬升1层墙柱,浇筑1层楼板的施工工艺,已成功地在欧洲最高建筑、世界最高全现浇钢筋混凝土结构工程中应用。

This paper introduces the composition, construction and quality control techniques of DOKA Large-area formwork Top 50 and Climbing formwork 150F applied in the construction of tanks of Guangdong LNG Receiving Station.

介绍广东天然液化气接收站罐体筒身施工时采用了德国Doka Top50大墙模板体系和150F爬升模板体系,以及模板的组成、模板的施工和模板的质量控制。

For the climb trajectory of a ramjet powered tactical missile,considering the feature of ramjet engine,the climb and speed-up performance of a missile are systematically analyzed.

针对以冲压发动机为动力的战术导弹的爬升弹道,首先考虑了发动机的特性,对导弹加速爬升的性能进行了系统分析,获得了导弹加速爬升过程中剩余功率和燃油消耗量随飞行状态变化的规律。

最新行业英语

行业英语