general engineer; chief engineer

基本解释总工程师

网络释义

1)general engineer; chief engineer,总工程师2)Chief engineer responsibility system,总工程师责任制3)chief design engineer,设计总工程师4)port engineer,superintendent engineer,造船公司总工程师5)Total Time Limit,总工期6)population efficiency ratio,总工效比

用法和例句

Approach Optimized Discussing of Total Time Limit of Project in Building Highroad and Bridge in Contract Condition;

合同环境下优化路桥项目施工总工期之方法探讨

SEC,as the side design,has to plan the total time limit for the owner,and on this basis,makes distribution of human resources,estimation of unpredictable and price difference,plan project cash flow and compare technology economy.

工程建设公司作为设计方,需为业主策划工程建设的总工期,并在此基础上进行人力资源分配、不可预见和价差测算、项目现金流曲线的规划、技术经济的比较等工作。

The maximum of population efficiency ratio is achieved by the route good used and the optimal production scheme is obtained through succesive adjustment range between outputs in this paper.

本文利用总工效比最大的路径通过逐步调整产量间的极差得到了最优生产方案。

最新行业英语

行业英语