coaling facilities

基本解释装煤设备

网络释义

1)coaling facilities,装煤设备2)gas fitting,煤气设备安装3)Equipment or furnishings.,装备,设备4)coal mining machinery equipment,煤机装备5)coal handling plant,输煤设备6)coal preparation equipment,选煤设备

用法和例句

Analyses the reasons of coal-stagnating in the coal handling plant in the coal production process and gives some treatment methods,it's significant to treat coal-stagnating not only in coal production in mine but also in the electricity generating station and coal washery.

分析了在矿井煤炭生产中输煤设备滞煤的原因,并提出了几种解决的措施,不仅对矿井煤炭生产中,而且对电厂、洗煤厂等工业领域中输煤设备滞煤问题的处理具有一定的指导意义。

Comment is made in the paper on development status of coal preparation equipment of last 5 years and it briefly describes those newly developed innovational equipment and their development trend.

对我国近期选煤设备的发展状况进行了总结和评价,重点介绍了发展创新的设备及其发展趋势。

The paper puts forward a selection decision-making model of coal preparation equipment by fuzzy comprehensive evaluation, and explains why the method is advanced and reliable with specific examples.

运用模糊综合评价法建立了选煤设备选优决策模型,并通过事例说明该方法的先进性与可靠性。

Mining machinery vocabulary--Coal preparation equipment

GB/T7679.7-1987矿山机械术语选煤设备

Application of CAPP for Manufactory of Coal Preparation Device

CAPP在选煤设备生产过程中的应用

Thin Coal Bed Working Surface Coal Plow Complete Set Synthesis Picks the Equipment Shaping and Necessary

薄煤层工作面刨煤机成套综采设备选型与配套

Seismic Researchn the Combined Structure-Equipment System of Coal Preparation Plant;

选煤厂结构——设备复合体系抗震研究

Equipment Lectotype of Full-mechanized Mining Face in Sandaogou Colliery

三道沟煤矿综采工作面设备配套选型

Preliminary study on strengthening transformation of process and management of equipment in preparation plant

选煤厂强化工艺改造和设备管理初探

Gravity separating equipment for coal--Performance evaluation

GB/T15715-1995煤用重选设备工艺性能评定方法

Type Choosing and Capability Analysis of the Air Drilling Equipment for the Coal-bed Methane

煤层气空气钻井设备的选型及性能分析

STUDY ON ENVIRONMENT VIBRATION CAUSED BY EQUIPMENT OF MULTI-STOREY COAL PREPARATION PLANT

选煤厂楼层内设备引起的环境振动分析

Realizing Mechanical and Electrical Equipment Integration by Frequency Conversion in Coal Preparation Plant

选煤厂应用变频调速技术实现机电设备一体化

Equipment Selection at Fully-mechanized Coal Face with Daily Output of 10,000 Tons in Mugua Coal Mine

木瓜煤矿日产万吨综采工作面设备选型

Suggestions on revision of GB/T 15715-2005 《Coal Gravity Separating Equipment-Performance Evaluation》

对GB/T 15715—2005《煤用重选设备工艺性能评定方法》标准修订的建议

complete set of kerosene burner production line

煤油炉生产成套设备

to have electricity, gas, running water and steam heating system

有水、电、暖气、煤气设备

Code for the coal preparation plant design of coal mine industry

煤炭工业选煤厂设计规范

Employee of a gas supply organization who checks gas meters and domestic gas apparatus

(抄煤气表、检查设备的)煤气公司雇员

Manufacture of Lurgi Gasification Key Equipment--Lock of Coal

鲁奇煤气化关键设备——煤锁的制造

Research on Equipments Coordination for Shearer in Soft Coal Thin Seam with Hard Roof

硬顶软煤薄煤层滚筒采煤机设备配套研究

最新行业英语

行业英语