belated claims

基本解释逾期索赔

网络释义

1)belated claims,逾期索赔2)compensation for delay,交货逾期赔偿3)claim for extension of time,工期索赔4)construction period claiming,工期索赔5)time-limit claim,工期索赔6)time claim,工期索赔

用法和例句

How to claim for extension of time to the construction enterprise;

施工企业如何进行工期索赔

Application of learning curve method in calculating the claim for extension of time;

熟练曲线法在工期索赔计算中的应用

The application of network analysis method in calculating of construction period claiming;

网络分析法在计算工期索赔中的应用

It analyses the component types of the costs of the construction claim,specifically discusses the calculation methods of construction period claiming and economical claim,to make the readers have a all-round realization to the calculation of the construction claim,and gives a references to the related technology persons.

分析了施工索赔的费用组成种类,详细地论述了工期索赔和经济索赔的计算方法,以使读者对施工索赔的计算有一个较为全面的了解,可供相关技术人员参考借鉴。

Treatment of underground obstacle cost and time-limit claims in pile foundation engineering;

桩基工程地下障碍物费用和工期索赔的处理

Study of the time claim affected by three factors;

三因素作用下的工期索赔

The application of network analysis method in calculating of construction period claiming;

网络分析法在计算工期索赔中的应用

Management of Working-day Claims for Construction Projects in FIDIC Construction Contracts;

建设工程在FIDIC施工合同条件下的工期索赔管理

Discrimination in relative concepts of period claim in international construction contract;

国际施工合同中工期索赔相关概念的辨析

On Claim Damages and Duration Calculation within The New Edition of Conditions of Contract for Construction;

新版《施工合同条件》中费用和工期索赔的计算

Analysis on Claim of Project Time in Mangement of Intermational Contract;

国际工程合同管理中工期索赔的分析与探讨

Effect piling up and effectweakening of network calculation in damageclaims on time limit analysis;

工期索赔分析中网络计算的叠加和发散效应

Study on the Principle of Calculation of Delay Claims for Project under Multi-Factor Affection

多因素影响下的工期索赔计算原则研究

To Analyse on Piling Up Effect and Weakening Effect in Claiming for Extension of Time

工期索赔中的叠加效应和发散效应分析

Exploration on Period Management and Claim of Construction General Contract Project

施工企业总承包项目工期管理与索赔的探索

The Study of Time and Cost Claims Based on FIDIC Contract Conditions;

FIDIC合同条件下的工期及费用索赔研究

STUDY ON THE PRINCIPLE OF DELAY CLAIMS WITH MULTI-EVENT INTERFERENCE;

多事件干扰下工期延误索赔原则研究

Analysis of Clients'Counter Claim Because of Project Delay

工期延误引起的业主反索赔分析初探

Expense Claim for Construction Delay of International Water Conservancy Project;

关于国际水利工程工期延误的费用索赔浅析

The Study and Apply on Construction Claims and Claim Risks;

工程项目索赔及索赔风险的应用研究

Summary of Clai mand Anti-clai min the Construction Project;

简论工程项目中的索赔与反索赔问题

On the Prevention of Proprietors Claim and the Strategies of Counter Claims;

业主对工程索赔的防范与反索赔策略

Claim management and counterclaim precaution of construction enterprises;

建筑施工企业索赔管理与反索赔防范

The discussion on the claims and counter-claims in construction project management

浅谈施工项目管理中的索赔与反索赔

最新行业英语

行业英语