full face round

基本解释全断面掘进炮眼组

网络释义

1)full face round,全断面掘进炮眼组2)full section advancement,全断面掘进3)full cross section excavation,全断面一次掘进4)TBM,全断面掘进机5)Tunnel boring machine,全断面掘进机6)full face rock tunnel boring machine,全断面岩石掘进机

用法和例句

Application Situation and Outlook of TBM in Underground Project in China;

全断面掘进机在中国地下工程中的应用现状及前景展望

The Analysis of TBM Cutter Wear Characteristic in The Construction of Qinling Tunnel;

秦岭隧道全断面掘进机刀具磨损规律分析

The Settlement Scheme of the Jamming Accident of TBM (Tunnel Boring Machine) with Two Shields;

双护盾全断面掘进机卡机事故处理方案

Optimal design for cutters of tunnel boring machines based on intelligent algorithms

基于智能算法的全断面掘进机刀盘优化设计

By studying the pressing mark results for three kinds of rock 216 times and themethods for adding force in the lab, presents statistical results of disc cutter pressing marktest for full face rock tunnel boring machine.

通过对三种岩石,216次压痕试验成果的研究,探讨了实验室压痕试验的加载方式;给出了全断面岩石掘进机盘形滚刀压痕试验的统计结果,并与已有的研究成果进行了比较,证明用统计方法预测盘形滚刀的推压力较为合理。

Correctly determining quality parameters of rock is the theoretical basis of use of TBM(full face rock tunnel boring machine)and its design.

正确确定岩石的性能参数是全断面岩石掘进机使用及高性能全断面岩石掘进机研制的理论基础。

A full face rock tunnel boring machine was highly sensitive to geologic situation.

全断面岩石掘进机施工对地质地层状况非常敏感。

Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;

秦岭隧道全断面掘进机掘进状况识别分析研究

There are mainly two kinds of roadheader: Tunnelling Boom Machine(TBM) and partial-size tunneling machine.

掘进机按照对于巷道断面的作用方式可划分为两种:全断面掘进机和部分断面掘进机。

Research and Design on Segment Erector for Small Diameter Full Face Tunnel Boring Machine

小直径全断面掘进机管片拼装机设计研究

Optimal design for cutters of tunnel boring machines based on intelligent algorithms

基于智能算法的全断面掘进机刀盘优化设计

On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine

双护盾全断面掘进机(TBM)遇软岩洞段的解困方案

Design of Hydraulic Loading System for a Composite Test Stand of Full Face TBM

全断面掘进机综合试验台加载液压系统设计

Manufacture and Quality Control of Lining Segment of a Construting Tunnel Constructed by TBM

TBM全断面掘进隧洞预制管片的施工及质量控制

Poor-geology consolidation grouting in double-shielded TBM full face tunnelling

双护盾TBM全断面掘进不良地质洞段固结灌浆

Research on Web-based Aided Decision-making System of Construction by Tunnel Boring Machine;

基于Web的全断面掘进机施工辅助决策系统的研究

The Study of Hydraulic Systems and Governing Characteristics of the Comprehensive Test-bed of the Shield Tunnelling Machine;

全断面掘进机综合试验台液压系统及调速特性研究

pattern recognition of full face TBM boring performance

全断面隧道掘进机掘进状况分类识别研究

Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;

敞开式全断面岩石掘进机连续掘进原理的研究

Study on Drive System of the Full-face Rock Tunnel Boring Machine;

全断面硬岩掘进机(TBM)驱动系统的研究

Research and Application of Refit Technology of All-Section Rock Tunnel Boring Machine

全断面硬岩掘进机全面整修技术研究与应用

Improvement on Material Conveying System of Model TB880E Full-face Rock TBM

TB880E型全断面岩石掘进机材料运输系统的改进

Study on the Continuous Boring Control System of Open Type Full Face Rock Tunnel Boring Machine;

连续掘进敞开式全断面岩石掘进机控制系统的研究

Investigation of rock cutting mechanism of disc cutter of fullface development machine

全断面岩石掘进机盘形滚刀破岩机理的探讨

Study on thrust-anticipating calculation of the disc cutter of TBM

全断面岩石掘进机盘形滚刀推力预测计算研究

最新行业英语

行业英语