The integral design of combustion control system realized by adopting T - XP type distributed control system (DCS) from Siemens AG for 2 X 350 MW units in second - phase project of Huaneng Fuzhou Power Plant has been presented, and the control circuit with distinctive features in the design being analysed.
介绍了华能福州电厂二期2×350 MW机组采用西门子T—XP DCS实现燃烧控制的系统整体设计,并对设计中具有特色的控制回路进行了分析。
Reconstructing Design and Its Realization of Distributed Control System(DCS)in Huaneng Fuzhou Power Plant
华能福州电厂分布式控制系统在改造中的设计与实现
Zilong (Fuzhou) Electrical Equipment Factory
志荣(福州)电子设备厂
Recontruction and Actualization of Transformer Substation Automatic Control for Fuzhou West Area Water Plant;
福州西区水厂变电站综合自动化的改造与实施
Automation Dispatch Decision Support System of Hydropower Plants in Fuzhou Area
福州地区流域水电厂自动化调度决策支持系统
Sticking to the best quality and service, Fuzhou Transformer Factory is making great contribution to the electric cause.
福州变压器厂坚持以最优的质量和服务,为电力事业的发展做贡献。
Fuzhou Xiyingmen Kitchen & Sanitaryware Fuxing Investment Zone Cabinet Factory
福州喜盈门卫厨福兴投资区橱柜厂
The Applications of the Monitor System for Auxiliary Power Units in Yongfu Power Station
厂用电监控系统在永福电厂中的应用
Leroy Somer (Fuzhou) is managed by Leroy Somer France.
利莱森玛福州公司位于福建福州,工厂占地面积近10000平方米。
Fuzhou Kehui Electrical Co., Ltd.
福州科汇电子有限公司
Fuzhou Sanxie Electron Co., Ltd.
福州三协电子有限公司
Analysis of problems of pile foundation of main power building in Chizhou Power Plant and their treatment
池州电厂主厂房桩基问题分析及处理
Study on the Lightning Overvoltage Performance for 500kV Yafu Transmission Line in Guizhou;
贵州500kV鸭福输电线路雷电过电压研究
Item Management of Second-Phase Technology Alteration in Fuzhou Plywood Factory;
福州人造板厂二期技改工程施工项目管理
Analyses on the Stability of Phosphogypsum Slag Disposal Pit Dam of Wengfu Phosphate Fertilizer Plants in Guizhou
贵州省瓮福磷肥厂磷石膏渣场大坝稳定性分析
Study on Stability of the Area of the Site of Erlang Power Plant in Xishui County,Guizhou Province
贵州省习水县二郎电厂厂址区稳定性研究
Studying Gongdong Chaozhou Power Plant 2~*1000MW Unit Project Management;
广东潮州电厂2~*1000MW机组项目管控研究
Guangzhou Likeng Waste-to-energy Power Plant;
《案例》:广州市李坑生活垃圾焚烧发电厂
Construction Of Steel-Concrete Combination Configuration Of First Period Engineering Of Yuzhou Electricity Factory;
禹州电厂一期工程钢-砼组合结构施工