From the precasting installation and the slip form,the paper gives the detailed introduction on the construction craft of curbs,points out the installation considerations of curbs,compares the precasting installation method with the slip form method and displays that the slip form construction is a faster,convenient,economical and practical new technology in the curbs construction.
从预制安装和现浇滑模施工两方面详细地介绍了路缘石的施工工艺,提出了路缘石的安装注意事项,比较了预制安装法和滑模施工方法,指出滑模施工是一种快捷、方便、经济、实用的路缘石施工新技术。
Totaling 216 piers of the bridge completed installation in the deepwater area in the Yangtze River on Saturday.
当日,上海长江大桥深水区216节墩柱全部预制安装完成。
Set up installation plan and budget and perform completion date.
制定安装计划和预算,按安装完工移交日期。
The fitting construction technology and control of 50 m precast T-beam
50m预制T型梁安装施工技术与控制
Discussed shallowly the mechanical Device the Installation Work Budget drafting Skill
浅谈机械设备安装工程预算编制技巧
Test on Incorrectly Installed Stress Cone of Prefabricated Cable Terminal
预制式电缆终端应力锥安装错位试验
Easily installed, no need basis etc. prefabricate assembly.
压缩机的安装简便,无需基础等预制装配。
Prefabrication and Installation of Large Fast-assembly Formwork in Saudi SS-22 Substation
沙特SS-22变电所大型快装模板预制与安装
The Brief Analysis of Quality Control of Pre-reserving and Pre-burying in the Installation Engineering of Subway Electromechanical Devices;
浅析地铁安装工程中预留和预埋工作质量控制
Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安装工作包括:预制加工、置、准、接和连接。
The Large Precast Components Conveying & Installational Construction Technique on Water;
大型预制构件出运及水上安装施工技术
Precasting and Installation of the Double-Track Simply Supported Monolithic Box Beams of High-Speed Railroad;
高速铁路双线整孔简支箱梁的预制和安装
Manufacture on One-pipe Piping Preheater of Alumina Digestion and Installation
氧化铝溶出单套管预热器的制作与安装
Trouble Prevention for the Production and Installation of High-voltage Plastic Insulated Cable Head
高压塑料绝缘电缆头制作安装的故障预防
Analysis of Electric Field in Incorrectly Installed Stress Cone of Prefabricated Cable Terminal
预制式电缆终端应力锥安装错位时的电场分析
The adjusting technology of long span prefabricated box beam over small radius curved bridge
小半径曲线桥梁上大跨径预制箱梁的安装技术
Installation and System Conversion of 60 m Precast Box Girder of Jintang Bridge
金塘大桥60m预制箱梁的安装与体系转换
405 Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安装工作包括:预制加工、安置、对准、焊接和连接。
The controller is floor/Base plate mounted by using the three pre-drilled holes in each leg. The holes are dimensionally on the same line for ease of mounting.
控制装置是通过每个支柱的三个预钻孔安装在地面/底板上。这些孔位于同一条支线上,便于安装。