The construction of the water-proofing layers is the last step of the construction of the elevated bridges of MRT system.
防水层施工是城市轨道交通高架桥梁的最后一道施工工序,其设计、施工质量关系到高架桥梁的耐久性和使用安全。
In the design of elevated bridges of urban rail traffic joint less line design is generally used to provide the stability and amenity during operation of trains,therefore,most rail structure is a long rail form.
城市轨道交通高架桥梁设计中,由于多采用无缝线路设计来提供列车运行时的平稳性和舒适性,因此轨道结构多为长钢轨形式。
Associated with Tianjin Light Railway located at the area with high seismic intensity, the structural design and seismic analysis for the integral station - bridge structure constructed by the station building and the elevated bridge in light railway is performed.
结合地处高烈度地震区的天津轻轨工程,对轻轨铁路车站建筑与高架桥梁进行整体设计与抗震分析。
Safety study on wheel/rail dynamic interaction of viaduct railway-vehicle subjected to earthquake loading;
在地震力作用下高架桥梁上轨道车辆的动态分析与安全性研究
Analysis on wheel/rail dynamic interaction of viaduct railway-vehicle subjected to earthquake loading;
地震力对高架桥梁轨道车辆影响之动态模型
Study on Transition of Road Bed of High Speed Railway and Bridge;
高速铁路路基与桥梁过渡段问题的研究
Transitional construction scheme for steel truss girder footbridge at Daxin station;
大新站钢桁梁人行天桥过渡施工方案
Finite element static analysis of the track on roadbedbridge transition section
铁路路桥过渡段长度有限元静力分析
An Analysis of the Bumping Phenomenon at the Roadbed-bridge Transition Section of Expressways
高速公路路桥过渡段桥头跳车现象研究的分析
Design and Construction of Highway and Bridge Transitional Section in High Class Highway
高等级公路路桥过渡段结构的设计与施工
Test and Research on Construction Technique for Road-Bridge Transitional Zone on High-Speed Railway;
高速铁路路桥过渡段施工技术试验研究
On the Stuffing and Construction of Graded Gravel for Transition Zone in the High Speed Rail Bridge;
浅淡高速铁路桥涵过渡段级配碎石的填筑施工
Research on Dynamic Properties and Strengthening Measures in Bridge-Subgrade Transition Section of Shuohuang Railway
朔黄铁路路桥过渡段力学响应及加强措施研究
Dynamic response properties of two-way subgrade in bridge-subgrade transition section under moving load
动荷载下路桥过渡段双线路基动力响应特性
Experimental Study on Bridge-approach Roadbed Dynamic Characteristic under High-speed
路桥过渡段路基速度动力特性试验研究
Test Study on the Dynamic Performance of the Track Structure at the Transition Section between Bridge and Plain Track
路桥过渡段轨道结构的动力性能试验研究
The Influence of Slab Performance on Differential Settlement of Bridge-approach
路桥过渡段差异沉降对搭板性能的影响
Vibration characteristics of high speed railway's bridge-subgrade transition section
高速铁路路桥过渡段振动特性试验研究
Segmental bridges when properly designed will prove to be practically free of maintenance for many years.
分段桥梁经过适当设计可以多年不需要养护。
The sunlight thermal gradient of the steel box girder and the deformation of the last girder in incremental launching construction of Hangzhou Jiangdong Bridge
Differential Settlement Control Criterion of Bridge-Approach and People-Vehicle-Road Interaction;
路桥过渡段差异沉降控制标准与人车路相互作用
Dynamic Performance Analyses and Experiment Study on Bridge/Approach Embankment of High-Speed Railway;
高速铁路路桥过渡段动力学特性分析及工程试验研究
Study on the Dynamic Vehicle-Roadway Interation and Tolerable Differential Settlement on the Bridge Approach;
路桥过渡段车路动力学分析及容许差异沉降研究