xenon build up after shut down

基本解释停堆后氙积累

网络释义

1)xenon build up after shut down,停堆后氙积累2)xenon build-up after shutdown,停堆后氙积累3)outage,停堆4)shut down,停堆5)unintentional reactor shutdown,无意停堆,误停堆6)planned outage,停堆大修7)Cooling at reactor shutdown,停堆冷却8)Shutdown margin,停堆裕量9)Shutdown,停堆检修10)scram,停堆停机

用法和例句

In this article it is discussed the nuclear safety requirements and the basis of the requirements,and the background of making these nuclear safety requirements from the point of view of CANDU planned outage nuclear safety management.

主要是从CANDU堆停堆大修期间的核安全管理方面论述CANDU大修期间的核安全要求及依据以及制定这些核安全要求的背景。

Strategy for Core Control when PWR Returning to Full Power Operation after Shutdown;

反应堆机组停堆检修后重返满功率运行的堆芯控制策略研究

The developing history of Daya Bay NPP scram.

简要介绍了大亚湾核电站减少非计划停堆停机计划形成的背景,以及近几年来非计划停堆停机的主要原因。

最新行业英语

行业英语