To solve the problem of the stability of the top pressure of blast furnace, a fuzzy-PID control system is designed.
针对高炉炉顶压力稳定是TRT系统正常运行的前提条件,设计了TRT系统高炉顶压的模糊PID控制方案,取得了较好的控制效果。
Design and Application of TRT Control Top Pressure System of Blast Furnace
TRT控制高炉顶压系统在高炉中的设计与应用
Study and Design of Blast Furnace Top Gas Pressure Control System in TRT;
TRT装置高炉顶压控制系统研究与设计
Research of Controling Quality About the Top Pressure of BF in Benxi Iron and Steel Co.
本钢二铁厂高炉顶压调节品质的研究
Optimizing Purification Process to Stabilize Blast Furnace Top Pressure and to Achieve TRT Generating Capacity
优化净化工艺确保高炉顶压稳定及TRT发电达产
Dynamic Modeling and Control of Top Gas Pressure in TRT System under Normal Condition;
正常工况下TRT系统高炉顶压动态建模及控制研究
An Improvement on Pressure Equalizer at Furnace Top of No.1 Blast Furnace;
武钢1~#高炉炉顶均压系统的改进
TRT Device on the Influence of Blast Furnace Top Pressure and Control
TRT装置对高炉炉顶压力的影响和控制
Design of top equalizing gas recovery system of No3 BF at Baoshan Iron & Steel Co.
宝钢3号高炉炉顶均压煤气回收系统设计
Research and application of the top pressure recovery turbine unit control for blast furnace
高炉炉顶余压透平发电控制研究与应用
Optimization of TRT Top Pressure Accuracy Control in 1650m~3 BF at Taigang
太钢1650m~3高炉TRT顶压精度控制优化
Stability Analysis and Control Experimental Investigation on the Top Pressure of Blast Furnace in a TRT Unit;
高炉煤气余压发电装置中炉顶压力稳定性分析与控制试验研究
None Bell Rutherfordium Summit Operation for Air Stemming Box Auto-Balance All Pressing the Apparatus in Xuanhua Iron & Steel Group 10# Blast Furnace
无钟炉顶气密箱自平衡均压装置在宣钢10号高炉的运用
OPTIMIZATION DESIGN OF RIGID FRAMES FOR THE SHAFT AND TOP OF A 3 200 m~3 BLAST FURNACE IN LIAN STEEL COMPANY
涟钢3200m~3高炉炉身、炉顶刚架优化设计
Control techniques for bell-less top in the new No. 3 BF of WISCO
武钢新3号高炉无料钟炉顶控制技术
Installation of bell-less top steel ring for blast furnace
炼铁高炉无料钟炉顶钢圈的安装技术
The new methods of burden distribution with width burden in a bell-less top blast furnace
高炉无钟炉顶按料流宽度布料新方法
Dynamic simulation of transmission system of blast furnace top charge distributor
高炉炉顶布料器传动系统动力学仿真
STUDY ON THE WIND LOAD FOR THE FURNACE TOP OF HUGE BLAST FURNACE
特大型高炉炉顶系统风荷载试验研究