Welding blast furnace base and distortion control;
大型高炉炉底板的焊接及变形控制
Physical simulation on raceway size of blast furnace;
高炉回旋区大小的物理模拟
Effect of tuyere structure on service life of full eccentrical cross-flow blast furnace tuyere;
高炉全偏心型贯流式风口结构对其寿命的影响
Discussion and analysis on the invalidation reasons of castable used in iron runner of blast furnace;
高炉铁沟浇注料的失效分析与原因探讨
Research and Application of The Thin-walled Lance for No.2 1880-m~3 B.F.;
2~#1880m~3高炉薄壁喷枪的研究与应用
Analysis of Working State of No.2 1880-m~3 B.F.'s Tapping Hole;
2~#1880m~3高炉铁口工作状态分析
Summary for High Production of No.7 B.F.in May;
7号高炉5月份高产总结
The Technological Reform and Application of BF Top Pressure Control in TRT;
TRT高炉顶压控制技术改造应用
Development of Process Control Computer System of No. 2 BF;
2号高炉过程机系统的开发
Discussion on the Rhythm of Charge Distribution of 2000m~3 BF;
2000m~3高炉布料规律探讨